Project Description
PROJECT
Long Term Parking Garage No. 2 Project
CLIENT
San Francisco International Airport
Construction Budget
$56M
Size
3,000 parking spaces
Services:
- Construction Management/Resident Engineering
- Stakeholder Engagement
- Project Controls
- CPM Scheduling
- Document Control
- Field Inspection
About
The San Francisco International Airport identified a need for additional parking spaces in light of recent significant passenger growth and continued forecasted growth over the long term. This project involved the construction of a new long-term, six-level parking facility to replace the existing parking Lot DD, adjacent to the current long-term parking facility. The parking structure project increased the long-term parking capacity at SFO by a net of 3,000 spaces.
CPM provided project management support services for this construction project. The services provided by CPM include construction management, resident engineering, office engineering, field inspection, and CPM scheduling.